Sturgeon Bay Industrial Park
Sturgeon Bay, Wisconsin
Baudhuin Incorporated engineers and surveyors assisted in the first two
phases of a major expansion of the industrial park. Contaminated soils
on site and the lack of downstream stormwater detention facilities necessitated
creative grading plans and on-site detention ponds.
Features:
36 acres, 21 industrial lots
1.15 miles of street
Sanitary sewer, watermain, storm sewer and detention ponds
Baudhuin Incorporated services:
Exterior survey
Platting
Sanitary sewer, watermain, storm sewer and street design
Plans, specifications and bidding
Construction staking, observation and administration
Assistance in creating a T.I.F. district and obtaining federal grants